* Denotes required fields for this form.
Section I: About Your Company
Your Name *
Company Name *
Telephone Number and Extension *
Fax Number
Email Address *
You Work For *
please choose
End User / Facility Owner
Architect/ Specifier/ Consultan
Cleanroom Builder/ Contractor
Distributor
Section II: Project Information
Application
please choose
Pharmaceutical/Biotech
Electronics/Semiconductor/Flat Panel/Hard Disk Drive
Hospital
Laboratory
Replacement Application
Other Application
Name of Project * (End User/Facility Name)
Location of Project *
Quantity of Fan Filter Units Required * (Size/Type and Quality)
Delivery Date Required
Level of Need *
please choose
Have an Approved Budget
Preparing to Submit a Budget for Approval
Gathering Information for Future Reference
Section III: Fan Filter Unit Information
External Dimensions
please choose
[2] 2AEx2AE / 600x600 mm
[3] 2AEx4AE / 600x1210 mm
[4] 4AEx4AE / 1210x1210 mm
[5] 1200x1200 mm (Metric Version)
[6] 1200x600 mm (Metric Version)
[7] 3'x4' / 900x1210 mm
Custom Dimensions
Construction Style *
please choose
[2] Esco Version 2 (Integrated Blower+Filter Casing)
[3] Esco Version 3, RECOMMENDED (Separated Blower Housing and Filter)
[R] Room Side Replaceable Filter
Construction Material *
please choose
[G] Galvanized Steel (Economical)
[A] Aluminium (Light Weight)
[P] Powder Coated Steel
[S] Stainless Steel 430 Grade (Pharma Applications)
Fan *
please choose
[A] Standard AC Fan with Individual Speed Control
[B] Energy Saving EC Fan, Group Speed Control
[C] Energy Saving EC Fan, 0-10vdc Control Signal Type
Airflow Volume and Pressure Drops
Airflow Volume * :
Cubic Meters Per Hour
Cubic Feet Per Minute
Required External Pressure Drop (E.P.D.) * :
Pascals
Inches Water Gage
(External pressure drop is the pressure differential between the inlet of the FFU and atmospheric pressure. It is the pressure drop required for example in recirculating type cleanroom applications. It must be specified by the cleanroom contractor/designer.)
* Total Pressure Drop (T.P.D.) = Filter dP (Clean) + Filter Loading dP (Reserve for Filter Loading) + Filter Plenum dP (Airflow Friction Loss in Plenum) + Required External Pressure Drop (E.P.D.)
* Esco will use 50% of filter dP for filter loading dP reserve
* For std. H13 filters, filter dP (clean) is 115Pa @ 0.45m/s, dP is in proportion to airflow velocity
* For std. H14 filters, filter dP (clean) is 125Pa @ 0.45m/s, dP is in proportion to airflow velocity
* Esco will select fan type based on airflow volume and total pressure drop required
* Contact Esco if you require assistance specifying the airflow volume and required external pressure drop requirements (provide cleanroom layout, number of FFUs, desired cleanliness class, desired noise level - if known, desired air changes per hour - if known)
Noise Level *
please choose
Esco Standard
Special Request (State dBA and Measurement Distance), Extra Cost Will Apply
(Noise level with measured per Esco standard for single FFUs at specified airflow, or if airflow is not specified, at 0.45m/s or 90fpm face velocity)
Filter Type *
please choose
[H] HEPA Filter (EN 1822 H13 @ 0.45m/s), Standard Type
[U] ULPA Filter (EN 1822 H14 @ 0.45m/s), Extra Cost Will Apply
Electrical Supply *
please choose
230VAC 50/60Hz Single Phase
115VAC 60Hz Single Phase
Other
100-130VAC 50/60Hz Single Phase
200-277VAC 50/60Hz Single Phase
200-240VAC 50/60Hz 3 Phase
380-480VAC 50/60Hz 3 Phase
Wiring Provisions, AC Fan Only *
please choose
Terminal Strip (No Power Cord Supplied)
IEC Connector on FFU with Power Cord (Specify Length and Plug Type)
Other Connector
Options *
please choose
Pre-Filter
Duct Collar (State Diameter)
Others (Eye Bolt, Sampling Port, etc)
** If more than 1 type of FFU is required, please copy and paste sections 15 to 23.
Section IV: Additional Services
Factory Speed Setting (According to Airflow Volume and TSP Data with CLEAN Filters)
Yes
No
Factory Labelling of Individual FFUs (Provide Cleanroom Grid Layout with Desired FFU Code)
Yes
No
Site Installation Assistance (Recommended for EC Fan Group Control Projects Unless Contractor Has Experience)
Yes
No
Captcha *
(If Required, We'll Provide Proposal for Travel Cost and Daily Rate)